How to install and debug the double roller press granulator?

2024/01/12

1. Install the device

First of all, according to the instructions and drawings, the equipment is installed on a flat, solid ground. Ensure a safe distance between the device and surrounding objects to avoid collision. During the installation, pay attention to adjusting the levelness of the organic fertilizer equipment to ensure its stability.

2. Pipe connection

The double roller press granulator usually needs to connect various pipes, such as feed, slag discharge, exhaust, etc. When installing, ensure that the pipe connection is tight, no leakage, and ensure that the material is unimpeded. At the same time, the exhaust device should be installed correctly to avoid dust leakage.

3. Power and air source debugging

The double roller press granulator needs to be connected to the power and air source to run. During the installation process, ensure the correct access of the power and air sources, and check whether the lines and air routes are safe. When debugging, check whether the motor and pneumatic device are working normally to ensure the power supply of the equipment.

4. Adjustment and calibration

After the installation is completed, various parameters of the equipment should be adjusted and calibrated. Such as roller gap, pressure, etc., to ensure that the material can smoothly pass through the equipment, and ensure the quality of the particles. The adjustment of these parameters needs to refer to the manual and experience, and is carried out by professionals.

5. Trial operation and acceptance

After completing the above steps, trial operation can be carried out. During the trial operation of the organic fertilizer production line, the operating condition of the equipment should be observed, such as whether there is abnormal sound and vibration. After the trial operation is correct, it can be accepted and put into use.

 