The organic fertilizer groove compost turning machine has the following specific requirements for the site:
1. Site selection and layout: The site should be far away from water sources and residential areas to avoid pollution to the surrounding environment. The site should have water, electricity, storage and other treatment facilities, and the ground should be hardened to prevent material leakage.
3. Ground conditions: The ground of the site should be flat and hard, and cement ground or hardened land can be selected. The ground needs to be treated with anti-seepage to prevent material leakage from polluting groundwater.
4. Supporting facilities: The fermentation site of the organic fertilizer production line should be equipped with rainproof facilities to prevent rainwater from eroding the materials. The site should have a good drainage system to ensure that the leachate can be effectively collected and stored. Equipped with automatic monitoring and control equipment to monitor parameters such as temperature and humidity during the fermentation process.
5. Material stacking: The material pile should maintain a certain shape, usually a trapezoid or triangle, to facilitate the operation of the compost turning machine. The width of the strip-type fermentation should be 2.0m-4.5m, and the height should be controlled at 1.0m-2.0m.
6. Operation and maintenance space: The site should reserve sufficient operation space to facilitate the movement and operation of the compost turner. Set up maintenance channels to facilitate daily maintenance and overhaul of the equipment.
By meeting the above site requirements, the normal operation of the organic fertilizer trough compost turner can be ensured, the compost fermentation efficiency can be improved, and the impact on the environment can be reduced.