Organic fertilizer production line equipment urea mill how to use to play a greater effect

2023/06/13

Ten tips for the use of urea mill:

(1) The urea crusher should be fixed on the ground and can be fixed with cement. If the working place is often changed, the crusher and the motor should be installed on the frame made of Angle steel.

(2) After installation, the urea mill should be carefully checked whether it is installed in place, and whether the installation is not firm enough. Whether the motor shaft and the crusher shaft are parallel, and whether the tightness of the transmission belt is appropriate should be checked.

(3) Before the mill starts, rotate the rotor by hand to check whether the operation of the organic fertilizer equipment is flexible and normal, whether there is a collision in the housing, whether the rotation direction of the rotor is correct, whether the motor and the mill are well lubricized.

(4) The crusher should not often replace the belt wheel to prevent the speed from being too high or too low.

(5) The mill should be idled for 2 to 3 minutes after starting, and then feed after no abnormal phenomenon.

(6) The crusher feed should be uniform, if there is noise, bearing and body temperature is too high or spray material outward, should be immediately shut down for inspection and troubleshooting.

(7) Before the work of the crusher, the staff should carefully check the materials to prevent hard objects such as metal and stone from entering the crushing chamber and causing accidents.

(8) When feeding, the staff should stand on the side of the reed crusher to prevent being injured by the debris bouncing out. Do not grip the long stalk too tightly to prevent the hand from being brought in.

(9) Stop feeding before stopping, wait for the material in the machine to be cleared, and then cut off the power to stop. Cleaning and maintenance should be carried out after shutdown.

(10) After 300 hours of urea mill operation, the bearing must be cleaned and the oil replaced; When installing oil, it is better to fill 1/3 of the bearing seat gap, not more than 1/2. The belt should be removed when the machine is shut down for a long time.